{"id":12108,"date":"2022-07-08T15:49:00","date_gmt":"2022-07-08T13:49:00","guid":{"rendered":"https:\/\/eihp.hr\/?p=12108"},"modified":"2022-07-12T12:09:01","modified_gmt":"2022-07-12T10:09:01","slug":"dan-informiranja-emobiyity-projekta","status":"publish","type":"post","link":"https:\/\/eihp.hr\/en\/dan-informiranja-emobiyity-projekta\/","title":{"rendered":"EMOBICITY project information day"},"content":{"rendered":"<p>On Thursday, July 7, 2022, the EMOBICITY Project Information Day was held on the premises of the Hrvoje Po\u017ear Energy Institute.<\/p>\n\n\n\n<p>EMOBICITY is a project implemented as part of the Interreg Europe program, which began in 2019, and aims to improve and advance policy instruments relevant to the field of e-mobility.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"12112\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/DDD-1024x768.jpg\" alt=\"\" class=\"wp-image-12112\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/DDD-1024x768.jpg 1024w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/DDD-300x225.jpg 300w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/DDD-768x576.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/DDD-16x12.jpg 16w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/DDD.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"12115\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/TITIII-1-1024x768.jpg\" alt=\"\" class=\"wp-image-12115\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/TITIII-1-1024x768.jpg 1024w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/TITIII-1-300x225.jpg 300w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/TITIII-1-768x576.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/TITIII-1-16x12.jpg 16w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/TITIII-1.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"12116\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/BBB-3-1024x768.jpg\" alt=\"\" class=\"wp-image-12116\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/BBB-3-1024x768.jpg 1024w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/BBB-3-300x225.jpg 300w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/BBB-3-768x576.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/BBB-3-16x12.jpg 16w, https:\/\/eihp.hr\/wp-content\/uploads\/2022\/07\/BBB-3.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p>In the past three years of implementation, many exciting activities have been carried out, including the creation of expert analyses, the holding of thematic workshops, gatherings of local groups of stakeholders, and study visits. Also, one of the key activities is the recognition of good practices that can inspire policy improvement and implement measures that will contribute to the faster and better development of all aspects of e-mobility.<\/p>\n\n\n\n<p>For more information about the project, visit the <a href=\"https:\/\/www.interregeurope.eu\/emobicity\/\" target=\"_blank\" rel=\"noopener\">LINK.<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>U \u010detvrtak 7. srpnja 2022. godine u prostorijama Energetskog instituta Hrvoje Po\u017ear odr\u017ean je Dan informiranja EMOBICITY projekta. EMOBICITY je projekt koji se provodi u sklopu Interreg Europe programa \u010dija je provedba zapo\u010dela 2019. godine, a ima za cilj pobolj\u0161anje i unaprje\u0111enje instrumenata politike relevantnih za podru\u010dje e-mobilnosti. U protekle tri godine provedbe odra\u0111en je [&hellip;]<\/p>","protected":false},"author":5,"featured_media":12118,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,26],"tags":[],"class_list":["post-12108","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projekti","category-dogadanja"],"_links":{"self":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/12108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/comments?post=12108"}],"version-history":[{"count":3,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/12108\/revisions"}],"predecessor-version":[{"id":12122,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/12108\/revisions\/12122"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/media\/12118"}],"wp:attachment":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/media?parent=12108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/categories?post=12108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/tags?post=12108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}