{"id":13996,"date":"2023-11-15T13:04:46","date_gmt":"2023-11-15T12:04:46","guid":{"rendered":"https:\/\/eihp.hr\/?p=13996"},"modified":"2023-11-15T13:06:33","modified_gmt":"2023-11-15T12:06:33","slug":"uspjesno-zavrsen-projekt-za-tajnistvo-energetske-zajednice-o-dostupnom-prekozonskom-prijenosnom-kapacitetu-maczt","status":"publish","type":"post","link":"https:\/\/eihp.hr\/en\/uspjesno-zavrsen-projekt-za-tajnistvo-energetske-zajednice-o-dostupnom-prekozonskom-prijenosnom-kapacitetu-maczt\/","title":{"rendered":"Successfully completed project for the Energy Community Secretariat on available cross-zonal transmission capacity (MACZT)"},"content":{"rendered":"<p>Energy Institute Hrvoje Po\u017ear, in cooperation with the company<a href=\"https:\/\/www.uprise.hr\/\" target=\"_blank\" rel=\"noopener\"> Uprise<\/a>, successfully completed a project for the client <a href=\"https:\/\/www.energy-community.org\/aboutus\/secretariat.html\" target=\"_blank\" rel=\"noopener\">Energy Community Secretariat<\/a>, which included two workshops and a final study officially titled \"Study on the 70% Target for Electricity Interconnection Capacities to be made available to Market Participants \".<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>The Study comprehensively calculates the transmission capacity that transmission system operators should make available to market participants according to Regulation (EU) 2019\/943, Article 16(8). For the transmission systems of members of the Energy Community in Southwest and Eastern Europe (WB6+UA&amp;MD), the current state of compliance with the Regulation was assessed, and structural congestion was detected accordingly. Additionally, the Study presents simulation results and expected capacity levels in 2027.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>The main goals of the project were:<\/p>\n\n\n\n<ol class=\"wp-block-list\" start=\"1\">\n<li>Analyze the compliance of transmission system operators with the requirements of implementing a minimum of 70% transmission capacity for cross-zonal electricity trading, taking into account the differences in the applied budgeting methodology (NTC and Flow-based)<\/li>\n\n\n\n<li>Evaluate the adequacy of development plans<\/li>\n\n\n\n<li>Make recommendations for developing the transmission network in the considered countries to fulfil the demanding provisions of the Regulation.<\/li>\n<\/ol>\n\n\n\n<p><\/p>\n\n\n\n<p>You can download the Study<a href=\"https:\/\/www.energy-community.org\/documents\/studies.html\" target=\"_blank\" rel=\"noopener\"> HERE<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Energetski institut Hrvoje Po\u017ear, u suradnji s tvrtkom Uprise, uspje\u0161no je zavr\u0161io projekt za naru\u010ditelja Tajni\u0161tvo Energetske zajednice, a \u0161to je uklju\u010divalo dvije radionice i finalnu studiju slu\u017ebenog naziva \u201eStudy on the 70% Target for Electricity Interconnection Capacities to be made available to Market Participants\u201c. Studija se na sveobuhvatan na\u010din bavi izra\u010dunom prijenosnog kapaciteta kojeg [&hellip;]<\/p>","protected":false},"author":5,"featured_media":13997,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14,25],"tags":[],"class_list":["post-13996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aktualno","category-projekti"],"_links":{"self":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/13996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/comments?post=13996"}],"version-history":[{"count":7,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/13996\/revisions"}],"predecessor-version":[{"id":14028,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/13996\/revisions\/14028"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/media\/13997"}],"wp:attachment":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/media?parent=13996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/categories?post=13996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/tags?post=13996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}