{"id":3750,"date":"2018-03-13T10:24:03","date_gmt":"2018-03-13T09:24:03","guid":{"rendered":"http:\/\/www.eihp.hr\/?p=3750"},"modified":"2018-03-13T10:24:03","modified_gmt":"2018-03-13T09:24:03","slug":"ebrd-i-hops-potpisali-sporazum-o-darovnici-za-izradu-studije-izvodljivosti-za-projekt-jacanje-glavne-hrvatske-prijenosne-osi-sjever-jug-koja-omogucava-razvoj-novih-interkonekcijskih-prekogran","status":"publish","type":"post","link":"https:\/\/eihp.hr\/en\/ebrd-i-hops-potpisali-sporazum-o-darovnici-za-izradu-studije-izvodljivosti-za-projekt-jacanje-glavne-hrvatske-prijenosne-osi-sjever-jug-koja-omogucava-razvoj-novih-interkonekcijskih-prekogran\/","title":{"rendered":"EBRD i HOPS potpisali Sporazum o darovnici za izradu studije izvodljivosti za projekt \u201eJa\u010danje glavne hrvatske prijenosne osi sjever-jug koja omogu\u0107ava razvoj novih interkonekcijskih prekograni\u010dnih dalekovoda\u201c"},"content":{"rendered":"<p>Europska banka za obnovu i razvoj (EBRD) i Hrvatski operator prijenosnog sustava d.o.o. (HOPS) ju\u010der su potpisali Sporazum kojim EBRD financira Studiju izvodljivosti (uklju\u010divo Studije procjene utjecaja na okoli\u0161 i dru\u0161tvo) za ja\u010danje glavne hrvatske prijenosne osi sjever-jug koja omogu\u0107ava razvoj novih interkonekcijskih prekograni\u010dnih dalekovoda. Nastavno je HOPS potpisao i Ugovor o konzultantskim uslugama s najbolje ocijenjenim ponuditeljem za izradu predmetne studije, konzorcijem predvo\u0111enim Energetskim institutom \u201eHrvoje Po\u017ear\u201c iz Zagreba (EIHP).<br \/>\nPartneri HOPS-a na ovom projektu su Elektroprijenos BiH i Nezavisni operator sustava u Bosni i Hercegovini (NOS BiH). Projekt obuhva\u0107a izgradnju dalekovoda u Hrvatskoj i interkonekcijskog prekograni\u010dnog dalekovoda izme\u0111u Hrvatske i Bosne i Hercegovine, s pripadaju\u0107im trafostanicama (pro\u0161irenjima postoje\u0107ih i izgradnjom novih). Nova interkonekcija izme\u0111u hrvatskih i bosanskohercegova\u010dkih elektroenergetskih sustava u svojim sredi\u0161njim dijelovima ja\u010daju regionalni koridor prijenosne mre\u017ee na pravcu Istok-Zapad, izme\u0111u ostalog daju\u0107i zna\u010dajan doprinos pouzdanom radu cjelokupne regionalne prijenosne mre\u017ee kao i potencijalnom dodatnom prijenosu iz jugoisto\u010dne Europe prema Italiji.<br \/>\nRazvoj prekograni\u010dne trgovine elektri\u010dnom energijom u regiji i izme\u0111u susjednih regija na paneuropskoj razini zahtijeva razvoj prijenosne infrastrukture kroz pro\u0161irenje i ja\u010danje posebice 400 kV interkonekcijskih veza te ja\u010danje prijenosne mre\u017ee unutar pojedinih zemalja kako bi se omogu\u0107io priklju\u010dak novih elektrana i razvoj potro\u0161nje, uz odr\u017eavanje visoke razine pouzdanosti rada elektroenergetskog sustava i sigurnosti opskrbe.<br \/>\n<div id='gallery-1' class='gallery galleryid-3750 gallery-columns-1 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/eihp.hr\/en\/hops\/'><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"457\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS-1024x585.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS-1024x585.jpg 1024w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS-300x171.jpg 300w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS-768x439.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS.jpg 1500w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/eihp.hr\/en\/hops1\/'><img decoding=\"async\" width=\"800\" height=\"811\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS1-1010x1024.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS1-1010x1024.jpg 1010w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS1-296x300.jpg 296w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS1-768x779.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS1.jpg 1479w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/eihp.hr\/en\/hops5\/'><img decoding=\"async\" width=\"800\" height=\"502\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS5-1024x642.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS5-1024x642.jpg 1024w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS5-300x188.jpg 300w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS5-768x482.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS5.jpg 1500w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/eihp.hr\/en\/hops4\/'><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"466\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS4-1024x596.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS4-1024x596.jpg 1024w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS4-300x175.jpg 300w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS4-768x447.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS4.jpg 1500w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/eihp.hr\/en\/hops3\/'><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"348\" src=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS3-1024x446.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS3-1024x446.jpg 1024w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS3-300x131.jpg 300w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS3-768x334.jpg 768w, https:\/\/eihp.hr\/wp-content\/uploads\/2018\/03\/HOPS3.jpg 1500w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n<\/p>","protected":false},"excerpt":{"rendered":"<p>Europska banka za obnovu i razvoj (EBRD) i Hrvatski operator prijenosnog sustava d.o.o. (HOPS) ju\u010der su potpisali Sporazum kojim EBRD financira Studiju izvodljivosti (uklju\u010divo Studije procjene utjecaja na okoli\u0161 i dru\u0161tvo) za ja\u010danje glavne hrvatske prijenosne osi sjever-jug koja omogu\u0107ava razvoj novih interkonekcijskih prekograni\u010dnih dalekovoda. Nastavno je HOPS potpisao i Ugovor o konzultantskim uslugama s [&hellip;]<\/p>","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3750","post","type-post","status-publish","format-standard","hentry","category-nekategorizirano"],"_links":{"self":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/3750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/comments?post=3750"}],"version-history":[{"count":0,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/posts\/3750\/revisions"}],"wp:attachment":[{"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/media?parent=3750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/categories?post=3750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eihp.hr\/en\/wp-json\/wp\/v2\/tags?post=3750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}